Compared with 11 similarly priced US-market EVs with a similar body style (2024–2026).
Strongest point
More cargo space
28.3 cu ftabove median
Nominal Capacity
205 kWh
Usable Capacity
186.7 kWh
Battery Type
Lithium-ion
Architecture
800 V
Warranty Period
8 years
Warranty Mileage
100000 miles
Cathode Material
NCMA
Source: Manufacturer
Home / Destination
Charging Type
J1772
Port Location
Rear Left
Charge Power
19.2 kW
Fast Charging
Fast Charging Port
CCS Combo 1
Port Location
Rear Left
Charge Power (max)
350 kW
Charge Time DC (10-80%)
28 min
Plug & Charge
Plug & Charge Supported
Yes
Preconditioning
Preconditioning Possible
Yes
Automatically using Navigation
Yes
Home / destination charging — 0–100%
AC full charge: fastest ~11h 5m
Charging option
Power used
Approx. time
Range per hour
Notes
Level 1 · 120V / 12A
1.4 kW
151h 35m
—
—
Level 1 · 120V / 16A
1.9 kW
111h 40m
—
—
Level 2 · 240V / 32A
7.7 kW
27h 35m
—
—
Level 2 · 240V / 40A
9.6 kW
22h 5m
—
—
Level 2 · 240V / 48A
11.5 kW
18h 25m
—
—
Level 2 · 240V / 80A
19.2 kW
11h 5m
—
—
Fast charging — 10–80%
Fastest DC 10–80%: ~29 min
Charging option
Power used
Approx. time
Range per hour
Notes
DC 50 kWCCS connector
41 kW avg.
3h 15m
—
—
DC 150 kWCCS connector
122 kW avg.
1h 5m
—
Limited by charger
DC 250+ kWCCS connector
203 kW avg.
39 min
—
Limited by charger
DC 350 kWCCS connector
273 kW avg.
29 min
—
—
Fast-charging times may use BEVDB estimates when measured 10–80% data is unavailable. Lower-power charger scenarios are estimated from the vehicle's 10–80% charging profile.
Estimated charging times are based on usable battery capacity, charging power and vehicle charging limits. Peak DC power is usually reached only briefly; average 10–80% power is more useful for estimating real charging time. Actual charging speed can vary by charger output, battery temperature, state of charge, weather, software and battery condition.
Reminder: Range and energy consumption figures are estimates. Actual results may vary depending on weather, driving style, terrain, and other conditions. Review the BEVDB methodology for estimate boundaries and source labels. If this model page looks wrong, use Report incorrect data and include this page URL plus an official source link when possible.