Total trip time
10 h 4 minPolestar 2 Long Range Single Motor Road Trip Planner
2024–2025
Starting price: €54,475
Road Planner
Estimate stop count, charging time, and total trip time for the selected EV.
Comparison Results
Start 100%Arrive 10%10-80%115 km/hOverhead 8 minCap 250 kWmild
Stops
3Charging time
58 minDriving time
8 h 42 minPolestar 2 Long Range Single Motor (2024)
Trip timing
Total trip time10 h 4 min
Driving time8 h 42 min
Charging time58 min
Stop time (charging + overhead)1 h 22 min
Stop overhead time24 min
Stops
Stops3
Stop time per 100 km8.2 min
Energy & assumptions
Effective consumption + sourceBEVDB model 18.7 kWh/100 km
User consumption appliedNo
