Lotus Eletre 600 2025 Road Trip Planner

Starting price: €102,090

Lotus Eletre 600 2025 image 1

Road Planner

Estimate stop count, charging time, and total trip time for the selected EV.

Comparison Results

Start 100%Arrive 10%10-80%115 km/hOverhead 8 minCap 250 kWmild

Total trip time

9 h 57 min

Stops

3

Charging time

51 min

Driving time

8 h 42 min

Lotus Eletre 600 (2025)

Trip timing

Total trip time9 h 57 min

Driving time8 h 42 min

Charging time51 min

Stop time (charging + overhead)1 h 15 min

Stop overhead time24 min

Stops

Stops3

Stop time per 100 km7.5 min

Energy & assumptions

Effective consumption + sourceBEVDB model 29.4 kWh/100 km

User consumption appliedNo